SUMMARY
Challenge
■
To install a people flow solution in a busy urban
hub on a tight deadline
■
To deliver an eco-efficient solution to support the
building’s commitment to sustainability
Solution
■
Close cooperation between KONE’s Major Projects
unit and the customer ensured on-time delivery of
KONE’s high-speed elevators
■
KONE provided advanced eco-efficiency technology
to meet the building’s sustainable agenda
FAST FACTS
Metrotower III
■
Completed: 2014
■
Size: 37,161 sqm
■
Height: 109 m
■
Floors: 29
■
Certification: LEED Platinum
■
Building owner: Ivanhoe Cambridge
Inc.
■
Developer: Ivanhoe Cambridge Inc.
■
Architect: Stantec Architecture Ltd.
■
Contractor: Ledcor Construction
Limited
KONE Solutions
■
11 KONE EcoSystemMR
®
elevators
■
KONE Polaris
™
Destination Control
System
■
KONE E-Link
™
monitoring system
■
KONE Care
™
Maintenance
Service